full
pattern
#d9d9d9
http://www.canameracoring.com/wp-content/themes/smartbox-installable/
http://www.canameracoring.com/
#004073
style3
CAN: (780) 979-1134 | USA: (936) 521-3665

Performance & News

icon-graphCCI 525 delivers 5 back to back Bossier/Haynesville core runs with 100% efficiency & recovery

  • 571’ of 3.5” OD core
  • 100% efficiency and recovery
  • 42 hours saved

icon-graph390’ JMS® (Jam Mitigation System) cuts 1,080’ of core in 3 runs and saves 10 trips in the Permian Basin

  • 1,080’ of 4” OD core
  • 100% efficiency and recovery
  • 12 operational days saved

icon-graphJMS® (Jam Mitigation System) 3.0 delivers Slimhole Coring Record and achieves 239’ of 3” OD core in the Permian Basin

  • 270’ coring assembly
  • 99.5% recovery
  • 3 Trips saved

icon-graph390’ JMS® (Jam Mitigation System) cuts 360’ of Lower Spraberry in a single run with 100% recovery

  • Longest single Spraberry core run
  • 100% efficiency and recovery
  • 4.7 days saved

icon-graphJMS® (Jam Mitigation System) delivers first 180’ core run and saves 4 trips in Sweetwater County, WY

  • 432’ of 4” OD core
  • 100% efficiency and recovery
  • 4 trips saved

icon-graphJMS® (Jam Mitigation System) delivers 150’ Cotton Valley core runs and saves 2 trips with 99.4% recovery

  • 278’ of 4” OD core
  • 99.4% efficiency and recovery
  • 2 trips saved

icon-graph420’ JMS® (Jam Mitigation System) delivers another Niobrara coring record. 375’ of 4” OD core in a single run

  • 375’ of 4” OD core
  • 100% efficiency and recovery
  • 3 trips eliminated

icon-graph360’ JMS® (Jam Mitigation System) coring platform saves 3 trips or $180,000 and establishes a new Niobrara and U.S. coring record

  • 360’ of 4” OD Core
  • 100% efficiency and recovery
  • 3 trips eliminated

icon-graph120’ JMS® (Jam Mitigation System), saves 2 Trips and Achieves 94% Recovery in Conecuh County, Alabama

  • 90’ of 4” OD Core
  • 100% efficiency and recovery
  • 2 trips eliminated

icon-graph120 ft. JMS® (Jam Mitigation System) Saves 9 Trips and $260,000 in the Mississippi Lime Formation

  • 312’ of 4” OD Core
  • 99% recovery
  • 9 trips eliminated

icon-graph180 ft. JMS® (Jam Mitigation System) eliminates 11 trips or $277k in operational savings while coring multiple formations in Central OK

  • 664’ of 4” OD Core
  • 99% recovery
  • 11 trips eliminated

icon-graph120 ft. JMS® (Jam Mitigation System) eliminates 3 trips and delivers an estimated $19,950 in operational savings through multiple formations in Central OK

  • 440’ of 4” OD Core
  • 100% recovery
  • 3 trips eliminated

icon-graph330 ft. JMS® (Jam Mitigation System) eliminates 2 trips or $106k in operational savings in South TX

  • 310’ of 4” OD Core
  • 100% recovery
  • 2 trips eliminated

icon-graph210 ft. JMS® (Jam Mitigation System) eliminates 6 trips or $180k in operational savings in Utah

  • 551’ of 4” OD Core
  • 100% recovery
  • 6 trips eliminated

icon-graph420 ft. JMS® (Jam Mitigation System) delivers 389’ of Niobrara Formation in a single run, producing an ROP of 45.6’/hour

  • 389’ of 4” OD Core
  • 100% recovery
  • 2 trips eliminated

icon-graph120 ft. JMS® (Jam Mitigation System) eliminates 8 trips or $280k in operational savings in Utah

  • 462’ of 4” OD Core
  • 100% recovery
  • 8 trips eliminated

Services

Jam Mitigation System (JMS®)

Two Jam Prevention. 4" Core. Nothing else like it.
READ MORE

Premium Wireline Coring

Limited or no trips during coring operations.
READ MORE

Canamera 525 Series Core Barrel

33% more core volume than 3” diameter core.
READ MORE

Why core?

So you can evaluate production and calibrate geophysical logs.
READ MORE

Expertise to serve a niche mentality

Our expertise and technology drives outstanding results in virtually any coring application.
READ MORE

Canamera Conventional Premium Barrels

High torque barrels for the most demanding conventional applications.
READ MORE

scroll
Loading posts...
link_magnifier
#004073
off
fadeInUp
loading
#004073
off
Back